1/03 UDC 6300 Process Controller Product Manual 235
6.11 Input #5 - Pulse Input Verification
Set up
Refer to Figure 6-8 and wire the controller according to the procedure
given in Table 6-9.
Table 6-9 Pulse Input Verification Setup
Step Action
1
Connect the copper leads from the terminals for Input 5 to the
Frequency Input Generator (Terminals 2 and 3).
2
Apply power and allow the controller to warm up for one hour before
verification.
Figure 6-8 Test Equipment connections for Calibrating Pulse Inputs
22674
1
2
3
4
5
6
7
8
9
10
11
12
13
L1
L2/N
22
23
14
15
16
17
18
19
20
21
+
Frequency
Input
Generator
+
Copper Leads
Verification
Enter the desired Zero and Span frequency range from the Input Generator
and check to see that the displays read the calibrated Zero and Span
values.