1/03 UDC 6300 Process Controller Product Manual 153
5.5 Start Up Procedure
Procedure
The Start-up procedure is given in Table 5-6.
Table 5-6 Procedure for Starting Up the Controller
Step Operation Press Action
1
Select manual
mode
MAN
AUTO
until “MAN” indicator is ON.
The controller is in manual mode.
2
Adjust the
output
or
to adjust the output value and ensure
that the final control element is
functioning correctly.
Upper Display
shows the PV value
Lower Display
shows OUT and the
output value in %.
3
Tune the
controller
SET
UP
Make sure the controller has been
configured properly and all the values
and selections have been recorded on
the Configuration Record Sheet.
To tune your controller manually, see
Appendix A .
Refer to Set Up group ‘TUNING” to
ensure that the proper selections for
PROP BD or GAIN, RATE MIN, and
RSET MIN or RSET RPM have been
entered.
For 2 Loop or Cascade control, refer to
"TUNING L2" for tuning parameters.
For controllers with ACCUTUNE, see
the procedure in this section.
4
Enter the local
setpoint
LOWR
DISP
Upper Display
shows the PV Value
Lower Display
SP and the local
setpoint value
or
To adjust the local setpoint to the value
at which you want the process variable
maintained.
The local setpoint cannot be changed if
the Setpoint Ramp function is enabled.
“H” or “R” appears in the upper display.
5
Select
Automatic
Mode
MAN
AUTO
until “A” indicator is ON.
The controller is in Automatic mode.
The controller will automatically adjust
the output to maintain the process
variable at setpoint, if the controller is
properly tuned.